Recent Knowledge Base Articles

  • Increase font size
  • Default font size
  • Decrease font size
Team TimeSheet for Outlook & SharePoint
TSS.gif

Designed for expense, billing, task and timesheet reporting and management in Outlook. Enables individual team member to track tasks, plan resources and report timesheets to SharePoint.

Title Filter     Display # 
# Article Title Hits
1 Published timesheets show wrong Start and End timing in SharePoint 40
2 OLAP tool shows blank grid/chart 927
3 What is the difference between Billable Hours and Duration? 2252
4 Where can I customize the title of the project/activity fields as well as specify mandatory? 2127
5 I have Team TimeSheet client addin installed, but I can't see the timesheet form when I open an appointment. 1606
6 Preventing members from viewing every project and task in their Outlook 1957
7 The 'Microsoft.ACE.OLEDB.12.0' provider is not registered on the local machine. 1860
8 Can I change the logo shown in the side bar of the appointment/task item window? 1477
9 How can I tag a project/activity or custom field data to multiple appointments/tasks quickly? 1640
10 Tagging project and custom field’s data to appointment/task item with the new side bar panel. 1665
11 We want to re-use already published appointment/task items in Outlook to re-publish back to SharePoint as new timesheet entries. Is this possible? 1560
12 We want to re-use already published appointment/task items in Outlook to re-publish back to SharePoint as new timesheet entries. Is this possible? 1513
13 I see a button 'Review Published' in the Team TimeSheet toolbar/ribbon. What is its use? 1944
14 What are the various ways I can publish my timesheets from Outlook to SharePoint? 2272
15 I see that we have to define a list of activities for each project. However, we have one global Activity list for all Projects. How can I avoid defining the same activities for every project? 2559
16 We want the categories field of the appointment/task item to store the tagged project/activity too. Is this possible in Team TimeSheet? 1893
17 I see that Team TimeSheet toolbar/ribbon has occupied most of my Outlook in every folder. How can I prevent this intrusion? 1904
18 Can user specify default values for the project/activity and any custom fields in personal level such that empty timesheet automatically gets the default data? 1711
19 We have the requirements to collect more information on the timesheet. Can we define our own custom fields? 2111
20 The Team TimeSheet toolbar is no longer visible, though it is installed. 2277
21 Is there a way to push out all projects and activties to all users automatically? 2585
22 When I enter the site URL into the Team TimeSheet admin panel to connect to the SharePoint site, it is not authenticating and keeps coming up with the credentials logon. What am I doing wrong? 2820
23 How can I get an extended or fresh trial of Team TimeSheet? 2577
24 What are the various notification alerts that are supported in Team TimeSheet? 2449
25 Apart from Project and activity, we require few more traceable metadata intrinsic to our reporting needs. How can we achieve this with Team TimeSheet? 2099
26 How can I, as the administrator, allow team members to selectively choose their own projects, activities or the drop down custom fields? 1869
27 What additional features are provided to team members, having admin access rights? 2263
28 As an administrator, I want to allow all team members to restrict reporting their timesheets from their default calendar or task folder. How can I implement this restriction in Team TimeSheet? 1753
29 How can I prevent team members from reporting their timesheets with expired projects or activities to the SharePoint? 2401
30 Our company policy requires that any timesheet reported to the SharePoint is more than 1 hour. How can I make sure every reported timesheet adheres to these criteria? 1789
31 One of my team members is my assistant. And I want her to report timesheets from my personal calendar, which is shared and accessible in her Outlook. But I want these timesheets in the SharePoint to be counted as mine, rather than the assistant. 1663
32 How does calculation of total cost works for reported timesheet? What variables are used in this calculation? 2236
33 How can I make sure every tagged appointment takes the start date of the project (and override the one chosen by the member)? Likewise, is it possible to enforce the end date of appointment with the project finish date or the activity due date? 1603
 
Banner